Construction permits. With the procedures and construction methods of architecture, structure, plumbing, electrical system, sanitary


1. An application to modify the building or building demolition house (Form 0.1)) or
Application for permission to move the building (Form 0.2).
2. A copy of Company Registration Certificate. Which the objective. T and authorities signed.
Legal representative who issued within 6 months (if the applicant is a legal entity) and authorized.
Certified copy of every page of a series
3. A copy or photograph the size of the original plot of land. And landed a certified copy of every page.
4. Written consent of the landowner The construction of the land or a copy of the lease land. (If the applicant
Not allow land owners) of a series
5. A copy of identity card Registration and a copy of the applicant. Authorized Representative.
Acting on behalf of corporate and land owners. With a certified copy of every page of a series

Documents Application sheet every applicant to sign and seal.
Registration tax up to 6 months personal copy of registration, identification card, passport, a set
Licenses for land in industrial estates T 01 / 2 with the conditions attached to the land and plans to convert a set
Copy of title deed as much real shot - the land of another person if the consent to build the plot of land with land ownership documents from a series
Proxy 30 U.S. tax stamp and copy of ID card, registration, passport delivery, and recipient of the first round series.
Architect Certificate with this form Us. 3 copies (never designed a home site plans, drainage or house safe and November. More than 1,000 square meters to use ordinary architects).
Certificate engineering with leaves Uy. 3 sets (designated use, warehouse PL. More than 1,000 square meters, a special project within 10 m using ordinary the Engineers).
Certificate of Supervision of leaves with Uy. 3 series (high-rise buildings and home extra large The ordinary engineering.)
Summary of the plan T 02/1-1 completely fill the applicant, architect, engineer certified.
The fc> 65 Ksc. Or fc '> 150 Ksc. To show transcripts show concrete engineerings calculate the applicant and certified.
Calculate a set list of cover sheet indicated a building owner, a house, construction, title - qualification - the address of engineerings ready to sign each sheet is calculated.
Alter the structure of houses contiguous to existing structurallys certified engineers can calculate the weight of the new structure is safe.
A copy of modifying homes to show the original building permit. And copies of the certified homes (if any).
building or house a large special certificate with a copy of Uy.'s Electrical system and mechanical the Engineerss. General qualifications up to 3 sets.
Documents prevent major structural fire 3 cm under the Ministerial Regulation No. 48/2540.

Registration of entity trusted institution. Authorized to sign all documents approved a set of sheets.

Copy of identification card. Registration of the authorized signatory. Trusted institutions. With a set of endorsements.

Show a copy of Uy.'s Degree engineering who certified the refractory three hours with a set of endorsements.

Certificate from a trusted institution to the applicant by Specific types of refractories for 3 hours a house, the owner with an authorized signature and qualification the Engineers.

Detailed 3-hour fire protection of materials standards ASTME - 119 are required by the size of the main structural with qualifications in the Engineersing drawings signed.

Certificate of Supervision of major structural fire protection for 3 hours with a copy of Uy. 3 sets (the Parties engineering to work.)

Reference to Building Construction